ANHVUCO

Groundbreaking Ceremony for the 10-Hectare Factory and Office Project at Bau Bang Industrial Park, Binh Duong

30/10/2024

Groundbreaking Ceremony for the 10-Hectare Factory and Office Project at Bau Bang Industrial Park, Binh Duong

A key project in the factory and office leasing sector

On January 30, 2024, the groundbreaking ceremony was held for the construction of a 100,000 m² factory complex located at Bau Bang Industrial Park, Binh Duong Province.

PROJECT OVERVIEW

Location: Bau Bang Industrial Park, Lai Uyen Town, Bau Bang District, Binh Duong Province, Vietnam
Total Land Area: 100,000 m² (10 hectares)
Total Factory Construction Area: 100,000 m²
Factory Structure: Modern 2-story industrial-standard buildings

FACTORY SCALE

The project includes 5 independent factory buildings:

  • X1: 20,760 m² (10,380 m² × 2 floors)
  • X2: 20,760 m² (10,380 m² × 2 floors)
  • X3: 20,760 m² (10,380 m² × 2 floors)
  • X4: 20,760 m² (10,380 m² × 2 floors)
  • X5: 20,760 m² (10,380 m² × 2 floors)

Standard Factory Dimensions: 60 m × 173 m

OFFICE AREA

Each factory includes an office building:

Office Area: 600 m² per factory (200 m² × 3 floors)
Dimensions: 10 m × 20 m

TECHNICAL SPECIFICATIONS & UTILITIES

Power Supply: 1,000 KVA (upgradeable according to operational needs)
Factory Height: 13 m at the eaves | 16 m at the roof peak
Fire Protection System: Automatic fire protection system approved by authorities
Electrical System: Stable 3-phase power supply
Internal Roads: Wide access roads suitable for trucks and container vehicles

Related News